Good night fellow steemit Indonesia all, tonight I will discuss about the construction of reservoirs in Paya Bakong.
The Aceh Provincial Government in cooperation with North Aceh Regency Government began in 2014 to build a giant reservoir of Krueng Keureutoe, in the slopes of Pante Bahagia hillsides, Paya Bakong sub-district, North Aceh regency.
Construction of the dam with a budget of about Rp1, 6 trillion is expected to overcome drought and prevent flooding in the surrounding nine districts.
The regent of Aceh Utara, Muhammad Thaib, told Media Indonesia on Tuesday (17/6) that the Krueng Keureutoe Reservoir is expected to accommodate millions of cubic meters of water during the rainy season.
Therefore, nine districts prone to floods include Paya Bakong, East Pirak, Matangkuli, Tanah Luas and Lhok Sokon, can be resolved.
Then the irrigation water needs for 45 thousand hectares (ha) of paddy field in the local area can be fulfilled. Thus the habit of drying the rice fields during the growing season can be overcome so as not to result in puso or crop failures.
The former GAM combatant is hoping that all parties will be able to assist the smooth development of the land clearing until the completion stage.
Target Government of Aceh and North Aceh regency, large reservoir is ready in 2017, "said the man who often called Check Mat.
He admitted the determination to build a technical reservoir is intended to immediately free the settlement of residents from the flood rendama every rainy season. Then able to increase rice production in the local area.
So far, the worst-hit area in Aceh Utara is Lawang Village, Matangkuli Sub-district. Every rainy season settlement residents on the edge of the River Krueng Keureutoe and Kroeng Pirak river it reaches 8-12 times a year. This condition leads them to poverty and loss of property.
And once this place is also known as an Aceh tourist attractions.