Day 1: Dig and Pipe for some sign lighting. Did a little back filling, concrete poured, and I'm getting too old for all the raking. If you've ever had to do this, you know what I mean





Day 2 : Finished backfilling, pulled wire, finished concrete, and installed and tested the lighting.