And we are back at it!
Some free time over the wet weekend means I get to work on the bike.
First thing is to remove the fuel pump and sensors from the back tank.
After that we need to route cables and fuel lines to the front of the bike.
Remove the headlight and speedo assembly
And install the new headlights and navigation tower.
We need to install the two tanks and route the fuel lines between them under the engine.
Installed the front fairing. Looks so much better than the stock one…
Assembly is complete and we no just need to fill the tanks and check for leaks…
And she is done!!!
Now the 690 looks like a proper bike!!!!
Of to test it out…