Lat friday all the timber was delivered for our "mancave" , it will be a ski-hut kind of building where we can have a bbq, watch soccer with friends or a nice place for our kids to hang out with friends.
I was impressed by the amount of timber needed, when they brought it by truck the new neigbours were already looking on what we were going to do 😂
First we dugged the holes for the poles. They had to be aprox a meter deep. The poles are 15cmX15cm so they are quiet big :)
When the wholes were finished it looked like if we were visited by huge moles :)
After the digging we placed the first poles and the all had to be on the same level, it was quiet some work in the beginning but after a while I got handy with it, and the friend who helped me (or better said I helped him) is a experienced carpenter / constructor.
Everytime a pole was set we finished the whole wit a bag of concrete and a bucket water. so that the poles are really locked in the ground.
At the end of the day all poles were placed and the construction is ready to for the roofconstruction. We will continue with that next monday evening
As you can see it will be a huge construction :) The measures are 10mx4m of which 6x4m is for the ski hut and 4x4 for a hooded terras... Can't wait to continue building :)
Have a great sunday !!!
Peter