The last entry about my works I placed about 8 months ago. Apart from a few entries on steepshot I didn't have much time to write. A lot happened. As far as I can remember, the last mention in my blog came from the time when I was still building in Ostróda near Olsztyn.
I will only remind you that my main task was to lay a metal roofing tile on the whole roof slope.
Immediately after that I received another order for roofing in Olsztyn. The scope of work included the purchase of wooden battens, installation of windows and laying flat, ceramic DOMINO tiles manufactured by Creaton.
We also installed the Lindab guttering system. All elements in anthracite colour created a harmoniously composed whole.
In the slope there are good quality 78cm x140 windows made by Velux. Equipped with external roller blinds, automatically controlled according to the customer's needs.
Works started in the summer, in July, took a relatively long time, because it lasted until September. This was due to two problems: the first one was not the accuracy of the carpentry with which the roof truss was made. It took us more than two weeks to straighten the slope to a satisfactory appearance and suitable for laying a flat tile, which unfortunately shows every curve.
And the second problem was to make a different roofing for a friendly construction company. The dates of both works coincided in time, which significantly lengthened the completion of the first investment.
The second order was a quick and pleasant accent in our business. A simple gable roof covered with brick colored roof tiles. It took 10 working days to cover about 200 square metres. Additional elements are Velux windows and Gamrat PVC guttering.
The final visual effect is very esthetic and simple:
Both of these works were completed at the end of September. In October we started a new project in cooperation with our permanent developer. But I will present these works to you in the next entry.