After spending most of last week with the flu, on Saturday he made calls to contractors. The foundation guy was supposed to pour the cellar floor last week, but we never saw him and haven’t been able to reach him. My husband spoke with the electrician and gave him the electrical plans on Saturday. He plans to start in March.
The plumber had been out and looked it over and said he’d get us an estimate last week. Not heard from him. We’ve not heard from the masonry guy either, but last we heard he was starting in April.
On Sunday he started putting up walls for things he could like the stairwell. Monday he was double checking the measurements of things in the kitchen so he could figure out what he needs for wood for the L wall.
A lot of items like the bathroom cabinet, foreground, and vanity and the utility sink for the laundry room have come in. On Monday he picks up the walls to the shower. He also needs to pick up more lumber for the laundry room walls and for the L of the kitchen cabinets. He’s got about 2 weeks to get the walls built for the electrician.
I’ve been doing the estimating and have it nearly done. I’m working on the last thing, the siding, on Monday. That’s why there’s been no posts, it’s very boring dry stuff.
So it looks like we are off to the races now, the work resumes.