G'day and hello once again. I've been busy all the time.That's a bit why I'm falling behind here on showing you of the progress what happened.
For new readers,who want to start at the beginning,the links are right here:
Part 1
Part 2
Part 3
After some heavy rain we had,another crew came one morning and started with the plastering work on the front wall and poles.The local truck driver just dumped a load of sand and gravel halfway into the road. Mai pen rai the Thais say,which means as much as no worries,all good.
The cars can drive around it,as you see they even put a stick with a plastic on it,for a visual warning,caution sign......
They work as clockwork and are making good progress.Almost done.
That's the view the next day.I love their work.Very neat for Thais.A big compliment to the plaster crew.
In the meantime,the 2. crew worked on the driveway.They dug a bit down at about 10 places,made up some wire mesh,put it down into the hole and poured concrete into it.
This should avoid cracks in the driveway and gives more stability,I reckon....
Also they laid the concrete blocks on each side of the drive way.
The wire mesh is laid and the Sparky (me) put a conduit in for the motor of the gate.I'm very happy with what has been achieved so far outside with the external contractor .
PD HOUSE is still fixing things inside and outside of the house.To compare PD HOUSE with the local guys who work here is like day and night....
Well,one day PD HOUSE will be gone,I hope sooner than later.
All pictures are made in early July 2017
Stay tuned...more to come...