a very happy and happy face after three days of not being able to go down the field because our crane truck was damaged, although not all of our work requires a crane truck but we are obliged to bring the truck to the field because we don't know what the conditions in the field are like and what the terrain is like, so to anticipate the shortage of alt in the field, that's why our office requires to bring tools to the field.
before we work we are also always given direction by the field leader or bus so that our work goes perfectly.
Our task today is to replace the complex's street lamp meter, which had not turned on last night due to heavy rain.
this is a meter that has a voltage of 900 watts, after I opened it and it turned out that the damage was quite severe, how can the meter be exposed to rain, and not caused by the negligence of the PLN officers, because if it rains accompanied by strong winds it is very risky to burn the voltage meter high.
after all I replaced it with a new one until the cable didn't burn but I still replaced it so that the meter lasts a long time and won't cause damage due to old or aged cables.
repairing the meter like this took almost 2 hours more because it wasn't just removing old stuff, just plugging in new stuff, there were several steps we took, such as checking the voltage of the electric current, how many vols came in and how many vols came out so that it could be stabilized with the meter.
As usual, whatever work, after all the good steps, we discuss with fellow workers and pray together as a sign of safety at work.