Today our work is very different from the beginning, which is usually we are always given direction by our field leader, but today our chairman cannot go directly to the field to accompany us in work because our chairman has an important meeting outside the region.
I hope we have a boss meeting about big projects in the future so that we have the opportunity to add more.
and today we are tasked with adding power to a meter in our own jurisdiction or area of duty.
Unfortunately, we arrived at the field at exactly 12 noon where the sun was still hot, but that didn't stop us from continuing to work because we were trained to work outside the field in an air-conditioned room wearing suits.
after we finished our work on the first point, we immediately moved quickly to a house where we would install a new high-voltage meter.
because this house has four floors and lots of workspaces, which are used to produce aceh coffee, it is certain that a house like this that is integrated with a production warehouse must be equipped with a large and high-voltage meter in order to expedite the work when several machines use electric power.
for the installation of a meter of this size we need only one hour because the cable needed has been provided a few days before
After everything is installed, we don't forget to do an electric current experiment, by turning on all the machines in this house to find out the electricity needs.