The contractor arrived mid afternoon and got the piece in for the doorway. We decided to not screw down the flooring, just cut slots for the screws for the threshold. That way the floor could expand a little.
Then he cut 2 new wider pieces for the edge and I could move the furniture back for the last time.
He still had the window for the barn to finish, and the grills for the windows. After those he won’t be back until it’s warm enough to finish the wood shed.