English
Greetings fellow Hive members, your friend The Builder is back with a new construction, in the industrial zone I decided to place a fish processing plant and in this post I show you how it was built.
This processing plant will be in charge of canning and distributing fish to the whole country (canned and fresh) so now you can enjoy a good tuna salad or a good grilled salmon.
Construction process
As there was no space, new roads had to be built to start the new industry; the whole space was fenced with white concrete and in the front with a wall of brown, blue, green colors. For the internal floor, the parking lot floor was filled with gray concrete.
For the internal structure the same colors of the front wall were used, a box was made and on the left side the office area was placed with its iron doors and cubes that simulate the roll-up doors.
Behind these doors a refrigeration room was built with iron, its doors and access to the dispatch area were placed and the other half of the space was for the warehouse, pallets were placed where the merchandise would go and we went to the manufacturing area.
The production area was separated with a small wall, an entrance was made and inside iron counters were placed, a large pan was placed, then cauldrons and other objects to simulate, made with more iron, hatches and doors. In another labeling area, plates and compasses were placed to simulate scales and anvils.
To conclude the work on the external walls, iron gates were made, gates were placed and finally 2 guard booths were installed. This way this work called "GoldFish fish processing plant" would be finished and the country already has several producing companies and the ones that are missing. I will say goodbye until a future post.
Español
Saludos compañeros de Hive, su amigo The Builder está de vuelta con una nueva construcción, en la zona industrial decidí colocar una planta procesadora de pescado y en este post les muestro como se construyó.
Esta planta procesadora estará encargada de enlatar y distribuir pescado a todo el país (enlatado y fresco) así que ya podran disfrutar de una buena ensalada de atún o un buen salmón a la parrilla.
Proceso de construcción
Como no habia espacio se tuvo que construir nuevas carreteras, para dar inicio a la nueva industria; se cercó todo el espacio con hormigón blanco y en el frontal con una pared de colores marrón, azúl, verde. En el suelo interno se rellenó el suelo del estacionamiento con hormigon gris.
Para la estructura interna se utilizaron los mismos colores del muro frontal, se hizo un recuadro y en el lado izquierdo se coloco el área de despacho con sus puertas de hierro y cubos que simulan las puertas enrrollables.
Detras de estas puertas se construyó una cava cuarto de refrigeración con hierro, se le colocaron sus puertas y acceso al área de despacho y la otra mitad del espacio fue para el almacén, se colocaron paletas dónde iría la mercancía y pasamos a la zona de fabricación.
El área de producción se separó con una pequeña pared, se hizo una entrada y dentro se colocaron mesones de hierro, se colocó una gran batea, luego calderos y otros objetos para simular, hechas con más hierro, escotillas y puertas. En otra zona de etiquetado se colocaron placas y brújulas para simular balanzas y yunques.
Para concluir la obra en los muros de la parte externa se hizo con hierro portones, se colocaron puertas y por último 2 cabinas de vigilancia. Así estaría terminada esta obra llamada "Planta procesadora de pescado GoldFish" ya el país cuenta con varias empresas productoras y las que faltan. Me despido hasta un próximo post.
Screenshots of the building process/ Capturas del proceso de construcción





Final build/ Construcción final



English
Greetings fellow Hive members, your friend The Builder is back with a new construction, in the industrial zone I decided to place a fish processing plant and in this post I show you how it was built.
This processing plant will be in charge of canning and distributing fish to the whole country (canned and fresh) so now you can enjoy a good tuna salad or a good grilled salmon.
Construction process
As there was no space, new roads had to be built to start the new industry; the whole space was fenced with white concrete and in the front with a wall of brown, blue, green colors. For the internal floor, the parking lot floor was filled with gray concrete.
For the internal structure the same colors of the front wall were used, a box was made and on the left side the office area was placed with its iron doors and cubes that simulate the roll-up doors.
Behind these doors a refrigeration room was built with iron, its doors and access to the dispatch area were placed and the other half of the space was for the warehouse, pallets were placed where the merchandise would go and we went to the manufacturing area.
The production area was separated with a small wall, an entrance was made and inside iron counters were placed, a large pan was placed, then cauldrons and other objects to simulate, made with more iron, hatches and doors. In another labeling area, plates and compasses were placed to simulate scales and anvils.
To conclude the work on the external walls, iron gates were made, gates were placed and finally 2 guard booths were installed. This way this work called "GoldFish fish processing plant" would be finished and the country already has several producing companies and the ones that are missing. I will say goodbye until a future post.
Español
Saludos compañeros de Hive, su amigo The Builder está de vuelta con una nueva construcción, en la zona industrial decidí colocar una planta procesadora de pescado y en este post les muestro como se construyó.
Esta planta procesadora estará encargada de enlatar y distribuir pescado a todo el país (enlatado y fresco) así que ya podran disfrutar de una buena ensalada de atún o un buen salmón a la parrilla.
Proceso de construcción
Como no habia espacio se tuvo que construir nuevas carreteras, para dar inicio a la nueva industria; se cercó todo el espacio con hormigón blanco y en el frontal con una pared de colores marrón, azúl, verde. En el suelo interno se rellenó el suelo del estacionamiento con hormigon gris.
Para la estructura interna se utilizaron los mismos colores del muro frontal, se hizo un recuadro y en el lado izquierdo se coloco el área de despacho con sus puertas de hierro y cubos que simulan las puertas enrrollables.
Detras de estas puertas se construyó una cava cuarto de refrigeración con hierro, se le colocaron sus puertas y acceso al área de despacho y la otra mitad del espacio fue para el almacén, se colocaron paletas dónde iría la mercancía y pasamos a la zona de fabricación.
El área de producción se separó con una pequeña pared, se hizo una entrada y dentro se colocaron mesones de hierro, se colocó una gran batea, luego calderos y otros objetos para simular, hechas con más hierro, escotillas y puertas. En otra zona de etiquetado se colocaron placas y brújulas para simular balanzas y yunques.
Para concluir la obra en los muros de la parte externa se hizo con hierro portones, se colocaron puertas y por último 2 cabinas de vigilancia. Así estaría terminada esta obra llamada "Planta procesadora de pescado GoldFish" ya el país cuenta con varias empresas productoras y las que faltan. Me despido hasta un próximo post.
Screenshots of the building process/ Capturas del proceso de construcción
Final build/ Construcción final