After two years of work, we finally opened the first unit of the 40 MW Gol Gohar solar power plant two weeks ago.
The power plant is located next to a 500-meter mountain and consists of four operational phases, each with a capacity of 10 megawatts.
On the opening night, we had a little problem in the reclator unit, which we were able to solve with the help of the engineering guys.