Concrete tops are poured to close the septic chambers that were installed two days ago
Main system
Workshop system
The cylinder is on top of the absorber tank which is the second chamber of the septic system.
Concrete tops are poured to close the septic chambers that were installed two days ago
Main system
Workshop system
The cylinder is on top of the absorber tank which is the second chamber of the septic system.