聽聽聽聽聽 Saludos amigos. Luego de una larga ausencia (ocho meses), por motivos laborales, hoy he decidido publicar. Durante ese per铆odo de tiempo he estado bastante ocupado porque comenc茅 a trabajar en una empresa de renombre que exige dedicaci贸n exclusiva, profesionalismo y alta calidad laboral; adem谩s, he estado supervisando algunas obras de considerable importancia.
聽聽聽聽聽
聽聽聽聽聽Greetings friends. After a long absence (eight months), for work reasons, today I have decided to publish. During that period of time I have been quite busy because I started working in a reputable company that demands exclusive dedication, professionalism and high quality work; in addition, I have been supervising some works of considerable importance.
聽聽聽聽聽 Inicio mis publicaciones del a帽o 2022, informando que me designaron la responsabilidad de supervisar una obra que beneficiar谩 a la comunidad, se trata de la construcci贸n de una acera, paso peatonal que evitar谩 que las personas caminen por la calzada arriesgando su seguridad. La obra en cuesti贸n est谩 ubicada en el Parque Industrial Las Terrazas, Urbanizaci贸n La Rosa, Guatire, Municipio Zamora del Estado Miranda, Rep煤blica Bolivariana de Venezuela.
聽聽聽聽聽I begin my publications of the year 2022, informing that I was designated the responsibility of supervising a work that will benefit the community, it is the construction of a sidewalk, pedestrian crossing that will prevent people from walking on the roadway risking their safety. The work in question is located in the Las Terrazas Industrial Park, La Rosa Urbanization, Guatire, Zamora Municipality of Miranda State, Bolivarian Republic of Venezuela.
聽聽聽聽聽 Acera: zona longitudinal, adyacente a la via (calzada o carretera), ubicada a una cota o nivel mas alto, dise帽ada y construida para el tr谩nsito de peatones, prohibida para la circulaci贸n de veh铆culos.
聽聽聽聽聽Sidewalk: longitudinal area, adjacent to the road (road or highway), located at a higher level or level, designed and built for pedestrian traffic, prohibited for the circulation of vehicles.
聽聽聽聽聽 Para la construcci贸n de una Acera es necesario conocer y seguir ciertos par谩metros:
- Planificaci贸n, dise帽o y replanteo.
- Limpieza y Excavaci贸n del terreno.
- Compactaci贸n y Nivelaci贸n.
- Aplicaci贸n de una capa filtrante y resistente, este proceso conciste en colocar una capa de piedra picada o triturada.
- Compactaci贸n de la piedra picada.
聽聽聽聽聽For the construction of a sidewalk it is necessary to know and follow certain parameters:
- Planning, design and rethinking.
- Cleaning and excavation of the land.
- Compaction and Leveling.
- Application of a filtering and resistant layer, this process consists in placing a layer of chopped or crushed stone.
- Compaction of the chopped stone.
聽聽聽聽聽 Se tom贸 la decisi贸n de construir la acera porque no existe paso peatonal en esa zona industrial, solo existe la via para el paso de veh铆culos de carga pesada. Lo que conlleva a que las personas se arriesguen todos los d铆as por pasar caminando por la calzada. La zona es insegura para los habitantes del lugar.
聽聽聽聽聽The decision was made to build the sidewalk because there is no pedestrian crossing in that industrial area, there is only the road for the passage of heavy-duty vehicles. Which leads to people risking every day to walk through the road. The area is unsafe for locals.
聽聽聽聽聽 La v铆a de acceso se encuentra ubicada en medio de la zona industrial y un talud. Cada vez que llueve se hace una laguna intransitable por la cantidad de barro que se desprende del cerro, por esa raz贸n, y la raz贸n antes expuesta, era necesario y de gran prioridad realizar esa obra social.
聽聽聽聽聽The access road is located in the middle of the industrial area and a slope. Every time it rains, an impassable lagoon is made by the amount of mud that is released from the hill, for that reason, and the reason explained above, it was necessary and of great priority to carry out this social work.
聽聽聽聽聽 Actividades realizadas:
Dise帽o y elaboraci贸n de los moldes de madera para la construcci贸n y encofrado de brocales.
Encofrado de Brocales. 2.44 m a 3.00 m, de manera intercalada o por secci贸n, por todo el trayecto dela acera. Es decir, uno si y uno no, dejado separaciones para las pr贸ximos brocales.
Vaciado de concreto en los moldes de brocales.
Encofrado de la acera.
Corte y colocaci贸n del emparrillado de acero que conformar谩 la acera. Este permite resistir las flexiones a las que ser谩 sometido la acera o elemento vial.
Vaciado de la mezcla de concreto en la secciones de la acera y cepillado de la superficie para crear una capa antiresbalante.
El proceso se repiti贸 una y otra vez hasta lograr la construcci贸n total del elemento vial para el paso peatonal.
聽聽聽聽聽Activities carried out:
Design and elaboration of wooden molds for the construction and formwork of brocades.
Brocales formwork. 2.44 m to 3.00 m, interspersed or by section, along the entire path of the sidewalk. That is, one yes and one no, leaving separations for the next brocades.
Concrete emptying in brocade molds.
Formwork of the sidewalk.
Cutting and placement of the steel grill that will make up the sidewalk. This allows to resist the push-ups to which the sidewalk or road element will be subjected.
Emptying the concrete mixture into the sidewalk sections and brushing the surface to create an anti-slip layer.
The process was repeated again and again until the total construction of the road element for the pedestrian crossing was achieved.
聽聽聽聽聽Las maquinarias, equipos y herramientas utilizadas para esta obra p煤blica, fueron:
聽聽聽聽聽Palas, picos, barras de acero, carretillas, herramientas de alba帽il, herramientas menores de carpintero, herramientas menores de cabilleros, cortadoras de barras de acero y cierra de mesa. Entre las maquinarias nos encontramos con las compactadora de rodillo, mini jumbo, pailoader (cargador frontal) y el cami贸n trompo (mezclador de concreto).
聽聽聽聽聽The machinery, equipment and tools used for this public work were:
聽聽聽聽聽Shovels, picks, steel bars, wheelbarrows, mason's tools, minor carpenter's tools, smaller cabilleros tools, steel bar cutters and table closures. Among the machinery we find the roller compactor, mini jumbo, pailoader (front loader) and the trompo truck (concrete mixer).
聽聽聽聽聽Materiales utilizados: Cemento, arena lavada, piedra picada, agua, barras de acero de 1/2 pulgadas, tiza para cabilleros, alambre, clavos de acero de 2 pulgadas y clavos dulce de 2.5 pulgada.
聽聽聽聽聽Materials used: Cement, washed sand, chopped stone, water, 1/2-inch steel bars, chalk for cabilleros, wire, 2-inch steel nails and 2.5-inch sweet nails.
聽聽聽聽聽Secciones de la acera y los brocales (borde de acera).
聽聽聽聽聽La acera: dise帽ada con una secci贸n transversal rectangular de 0.90 m x 0.30 m. cada secci贸n tiene una Longitud de 2.44 m.
聽聽聽聽聽Brocales (borde de la acera), secci贸n transversal en forma de "L": base mayor 0.50 m, base menor 0.16 m, altura mayor 0.30 m, altura menor 0.15 m. Longitud por secci贸n: 2.44 m.
聽聽聽聽聽Measurement of sidewalk sections and brocades.
聽聽聽聽聽The sidewalk: designed with a rectangular cross section of 0.90 m x 0.30 m. each section has a length of 2.44 m.
聽聽聽聽聽Brocales (edge of the sidewalk), cross section in the form of "L": major base 0.50 m, minor base 0.16 m, greater height 0.30 m, minor height 0.15 m. Length per section: 2.44 m.
聽聽聽聽聽La obra fue ejecutada en su totalidad en tan solo una semana, gracias a que no fue necesario mandar a traer el cami贸n mezclador de concreto, esto solo fue posible porque la empresa encargada de la obra, cuenta con su propia f谩brica de concreto, una vez que la mezcla es elaborada, la cargan en sus propios camiones mezcladores de concreto, tanto la empresa como los camiones se encuentran en la misma zona industria donde se llev贸 acabo la obra, permitiendo de esta forma reducir significativamente el tiempo de ejecuci贸n.
聽聽聽聽聽The work was executed in its entirety in just one week, thanks to the fact that it was not necessary to send to bring the concrete mixing truck, this was only possible because the company in charge of the work, has its own concrete factory, once the mixture is elaborated, they load it into their own concrete mixer trucks, both the company and the trucks are located in the same industrial area where the work was carried out, thus allowing to significantly reduce the execution time.
聽聽聽聽聽 A continuaci贸n, les dejo la memoria fotogr谩fica del trabajo realizado. Debo informar, que la comunidad que transita esta ruta, est谩 contenta por la obra realizada, permitiendo que sea m谩s seguro el caminar por esta v铆a.
聽聽聽聽聽Next, I leave you the photographic memory of the work done. I must inform you that the community that travels this route is happy for the work done, allowing it to be safer to walk along this road.
Photography
馃憞 馃憞
馃摫 SAMSUNG GALAXY A12. 馃摲