After getting started just a little bit of over 2 months ago, the work has started on a remodel of the kitchen and bathroom. It has been a long two months of preparation, picking out products, and staying on budget.
All of our kitchen cabinets and bathroom products all showed up about mid-june and has been taking up a lot of space since then.
The hiccups are finding things done to the house incorrectly, causing us delays and money.
First we ran into a problem with the new shower install because the floor was not level, they had to do some modifications to the frame work and cut away some on the dry wall.
So...... after that debacle, we have been advised not to use the shower until our glass frameless doors are installed.👀🙄😒
The drywall has to go up before it can be installed and that won't take place until late next week. Can't take a shower.......UGH!!!!!!
The kitchen was not without it's issues, come to find out that the light you see in the first picture above in front of the window was not wired correctly before that one was placed up there, and there was a big hole discovered that had to also be fixed.ðŸ˜
Oh yeah.....there was a hole under the old medicine cabinet we had removed just under the light vanity that was also removed. I will have to have that repaired also.
Plumber left some work undone in the kitchen that he was supposed to had been done so my cabinet installer could start, but now he can't actually start until Monday versus him starting this past Friday as it was planned.
Another plumber was called to to my house after complaint was made aware, the original guy was talking to me about heading out for a two week vacation, so I guess he was thinking on that. He did do a great job, so I can't be mad at him for that.......all worked out with another coming out to finish his job.
My nerves are a little shot, but in all, everything is coming together nicely..... it's just gonna take some patience on my part.
Thanks for stopping by and I hope you enjoy the rest of your weekend!