Housing from scratch, or all the stages of construction of his house! The stage floor and walls. Well my dear readers, continue its construction.
Turned out to be a couple of warm and Sunny days and are taken back to the tool. As it was not finished floor framing, finish it. Now it looks like this:
Many of you, my dear, I ask: why are these jumpers?
Answer: They are needed for the footings of the walls.
Well, Paul, we have finished, now it's time to collect the wall. What is different about the construction of ordinary walls, from the walls of a frame house? The fact that the walls of the frame house going up right on the floor and then rise. Plank Board ceiling of the first and second floors on the floor that would be convenient, and start to build up the wall:
Of course the photo is not the finished wall, but is ready:
The rise of the wall 6 meters in length and 3 height a bit scary actually to drop it no one wanted.
A little bit of me for size comparison, my height is 174 cm, if that)))
Then came out another interesting fact. During the construction of the first wall, the calculation of the rack frame had to be 290 inches, plus it top and bottom rail at 5 inches would be a full 3 meters, but as always in "a hurry", sawed stands at 3 meters, they sewed the upper and lower harness and got 3 meters 10 centimeters from floor to ceiling in the draft))).
ZLODY!!!! Why do you have ceilings of three meters??? Wouldn't it be easier to save money on lumber? Will answer you immediately, no. The standard lumber is a multiple of 2 and 3 meters, so if you do the ceiling of 2.5 meters, each 6 foot Board "throw" of 1 meter in anywhere, firewood, etc., and why? We paid for it! The number of the lumber will not change. So just cut the 6 meters in half.
Securing the wall vertically, collect and set the following.
Then went small and "nasty" rain, which spoiled all the plans and we left the work site. And now waiting for good weather.
Watch out for the continuation....