Housing from scratch, or all the stages of construction of his house!
Last winter, the Foundation has "aged" over the winter we accumulated about 60,000 rubles ( 1000 $ ). And the work began.
The construction of the expensive - told me almost all relatives, friends and acquaintances. But to do nothing will be built slowly. And so what we have at this stage:
Land ownership of 6 acres. (90,000 rubles)
Container construction (23,000 rubles), without storing the tool and building material, just not where.
Finished piling Foundation of 6x9 meters, piles every 1.5 meters. (37500 rubles).
Tool: shovel, Amour, buckets, hammers, hand saw, electric chain saw, roulette.(~10,000 rubles).
Drank-material beam 150x150mm, 200х50мм, 150х50мм (~60,000 rubles).
Nails, screws, corners, plates, fire-bio-protection, gloves. (~12000 rubles).
Other costs: shipping, building materials, entry fees, registration of land ownership, etc. (~15,000 rubles).
To date spent: 240 000 rubles, according to the calculations is enough on the 1 floor and ceiling.
The stages of framing of the Foundation:
Installation lag floor insulation under the timber 50х200мм:
Construction is very sturdy and has no free circulation. In many beliefs from the Internet, this is a valid "great designer."
Watch out for the continuation....