Heyy very good morning to everyone in this fantastic community, in this post I show you my physical activity yesterday, which consisted of a day of daily work.
My day started at 6 am, earlier than usual as the work schedule was a bit extensive and we wanted to finish before dark. We serviced 5 splits, all 1 ton. Each maintenance consisted of total disassembly of the units, both units (indoor and outdoor). Clean them with pressurized water with a hydro scrubber, correct bad practices, as you can see in the pictures they left bent one of the pipes of the evaporator outlet, paint the parts that are rusted or corroded. Reassemble them and proceed to install them again.
The photos presented here are my own, taken with my phone.
Translated with DeepL.com (free version)
Heyy muy buenas a todos en esta fantástica comunidad, en esta entrada les muestro mi actividad física de ayer, la cual consistió en un día de trabajo cotidiano.
Mi día comenzó a las 6 am, más temprano de lo habitual ya que el plan de trabajo era un poco extenso y queríamos terminar antes del anochecer. Le dimos mantenimiento a 5 splits, todos de 1 tonelada. Cada mantenimiento consistía en el desarme total de los equipos, ambas unidades ( interior y exterior ). Limpiarlos con agua a presión con una hidrofregadora, corregir malas prácticas, como se puede observar en las fotos le dejaron doblada una de las tuberías de la salida del evaporador, pintar las partes que estén oxidadas o corroídas. Volver a armarlos y proceder a instalarlos nuevamente.
Las fotos aquí presentadas son de mi propiedad, realizadas con mi teléfono.
This report was published via Actifit app (Android | iOS). Check out the original version here on actifit.io