So how much do you have to pay?
Here is the money I get to build a house:
Land prices, civil works, taxes
Design cost (including control costs)
Construction cost
furniture
Home Appliances
landscape
curtains, blinds
sunlight
tax
The price of land is very different from region to region, so I pass it.
You can think of the design cost from 0 yen to 100 million. From here, I will tell you about the design cost of the single-family house plus the control ratio after about 50 pyeong.
Ideally, 10% of housing construction costs should be considered.
People in Korea are expensive if design cost is 10 million won and 20 million won.
It's free, but what design is so expensive? Design is really really important.
Here are some reasons why you should spend a lot of money on design.
With constant consultation with the designer, I get a house close to what I want.
As much detail as possible, the friction experienced during the construction process can be minimized. (Why are you building this in your design?
You can think about this too much. -> Design money = the quality of the house coming out (more important than choosing a construction company ..)
The details are also changed by the careful field management of the designer who designed it.
Do not spare the design cost. This is what I really emphasize.
Usually we do the design while contracting construction contractor. There is a place for free.
It is also the approximate content that I want to say because of permission room! There are designers near the city hall / city hall that draw about 10 drawings and receive around 500 to get permission.
There are designers of about 1000 ~ 20 million won, which allow me to escape from the permission room, specialize in designing,
Now, the quality of the house is starting to change.
You can think about the amount of 3000 ~ 6000, the houses in magazines, the philosophy of the architects, and the details of the architectural tastes
Usually there are over 100 design books. It sounds like you're drawing a lot of detail around here and there. It is the location where the resting hanger takes place, the brick piled pattern,
And now it is those who are close to or exceeding the billionaires. Some of the greatest college professors ... Top college professors ...
In this case, you should be careful that the pride of architects, insistence, and stubbornness are very strong, so you may not be able to choose one furniture at will.
It's cool even if it's cold.
I have told you about the office according to the amount of money, which is divided for convenience, but it is not an absolute standard.
Now it is construction cost.
400 per pyeong. You probably heard a lot. It is easy to search the internet and it is easy to get hold of Korea since 10 years ago.
And now there are those who build 400 per pyeong. I can not build a house I like.
Just look at the amount of money you can build a house that will fit the floor plan. But when I start to write the materials I like and the materials I like, I go up without limit
Considering the right line, I'd like to say 600. In other words, you have to think about 300 million as a pure construction cost of a house about 50 pyeong.
In the case of my house, it cost about 750 pyeong when I only paid for the construction cost. This is the amount that depends on the high-grade materials, the structure of the house, the number of toilets, and so on.
It is now furniture.
The furniture we refer to here is built-in furniture and kitchen furniture, not the furniture we usually use, such as table, chairs, and chairs.
This is not a concept of building a house and buying necessary furniture, but it is an amount that you must consider when building a house because it is a piece of furniture that will be built when you build it.
This is also a very wide variety of specifications, depending on how you make your house, but the deviation is very large .. If you take about 8% of the construction cost,
I also heard about 8% of my house.
It usually has a built-in kitchen, kitchen sink, picnic area, built-in bookshelf, and so on.
Some household appliances need to be bought slowly. Sometimes there are furniture that needs to be put into a built-in dishwasher or oven, so if you have the money, it is best to do it.
This part is different for each person,
Next is the landscape.
Landscape is very varied, but it is best to keep 10 million won.
If you think of landscaping, you should first plant landscape gardening (you have to plant it unconditionally by law).
Do you need to finish the dirt floor?
You also have to build a blanket, and you need to create a gate if necessary. Parking lot and so on.
My house did not hear much about it, but it cost me a little on the fence and I think I have finished about 1000.
The land is big because it is a little rural area! This can cost you a lot.
Curtains, blinds -> This is also a part of people who do not think without a thought.
It is a minimum of 100 to hundreds of entries.
I do not sleep in the morning because of the light, I want to protect my privacy.
I also thought that I was going to have to do something, and then I was having a hard time installing it. This is also a generous 300 ~ 500 hold it.
It is sunlight. There are more people who do not do anything.
It is tax now, but it is enough for other registration fee, acquisition tax, etc. and hold 500 ~ 600.
I want to know this in detail so that I can make a plan. You still have to prepare in advance, but you will be less troubled later.
So somebody comes and talks like this.
I'll build a house for 500 pyeong! Let's build it!
So you have to start counting from then? I want to build it at 50 pyeong, so I need 250,000 pyeong.
Under the assumption that there is ground
Design cost 3000, construction cost 250 million, furniture 2 ~ 3000, landscape 1000, curtain, blind, tax 1000
I have to keep a minimum of 10% extra funds because I have tightened the construction cost.
That is to say, not 250,000 but 350,000, so you can do it without worrying about it.
There are many reasons why the cost of construction goes up during the construction process. It is mainly when I changed the materials I want to a higher grade.
If you try to get a wooden floor after going to the river floor, you change the tile to income.
I have read books, manuals, blogs, and so on. haha
Anyway! So, when the earth is brought up to the soul, when the project is completed, the budget is prepared considering the above points.
If you stay at the last minute (borrow a little money from the neighborhood), you can get a mortgage loan.