I mean no fancy code changes, all I propose is change from 13 weeks to 4 weeks, no other dual pool ideas and things. That can be done for this HF.
I mean no fancy code changes, all I propose is change from 13 weeks to 4 weeks, no other dual pool ideas and things. That can be done for this HF.
RE: HF Proposal: Vote to Reduce Power Down Period to 4 Weeks